Contact Details

Our Office in Jena:
  • Am Anger 32
  • 07743 Jena
  • Germany
  •  
  • Phone: +49 3641 30 90 55
  • Fax: +49 3641 30 90 55

Contact Form

Recent News

23.09.2011

Neue Webseite ist online

Unser neue Webseite ist nun online. Mit einem neuen Design und dem...

[more...]

ARCHIVE

References Civil Engineering

[Translate to English:] Neubau Wandersmanntunnel ICE-Strecke Köln - Wiesbaden

2000Implementation planning and static calculation open building pit lining
Implementation planning and static calculation tunnel segments
Constructor:Deutsche Bahn AG
Planning:Arge NBS Köln-Rhein/Main, Dyckerhoff & Widmann
Construction Time:01/1998-04/2002 - Opening May 2002
Planning Phases:Work phase 3 – 5
Static calculation of construction pit reinforcement, dimensioning of drilled piles and tunnel segments
Design of the supporting structure planning execution drawings (positions of joists for construction pit reinforcement, connection details etc., drawing up formwork plans and structural drawings for drilled piles and tunnel segments)
  • Shoring of open pile wall with Stahlträgerabstrebungen in 2 planes
  • Tunnel cross-section - with angled retaining wall for slope stabilization
  • Completion of the tunnel entrance with one-sided retaining wall
  • View - open pile wall sheeting
  • A steel beam position - Baugrubenaussteifung

2012 © wbp-bauplanung - Ingenieurbüro Dipl.-Ing. Wolfram